Systec Autoclaves Installation

Case Details

Client Name: Queensland University of Technology – Rachel Self

Client Website: https://www.qut.edu.au/

Client Location: Brisbane, QLD

Project Duration: 4 weeks (plus delivery time)

Need more help?

Reach out by phone or email or send a sample — our technical experts are ready to help!

Address Business
Bioline Global Pty Ltd

PO Box 873, Narellan NSW 2567
Working Time
Monday - Saturday: 8:00am - 6:00pm
Holiday : Closed
The Problem

New Autoclave Requirement

QUT required a new autoclave capable of handling specific load sizes for laboratory operations. The new equipment also had to fit into a restricted space within the existing laboratory setup, which posed limitations on model selection and installation.

The laboratory’s plumbing was not designed to support the drainage requirements of the new autoclave. This created a significant installation challenge, as conventional drainage solutions would have required costly and disruptive modifications to the existing infrastructure.

Our Solution

A Custom-Designed Drain Reservoir

The Systec HX-150-2D installation provides Nepean Hospital Pathology with advanced sterilisation capabilities that exceed PC3 facility requirements. The vacuum and quick cooling features significantly improve processing efficiency while maintaining the highest biosafety standards for infectious material handling.

Project Results

Long-Term Reliability

The autoclave was successfully installed and commissioned, meeting both spatial and operational requirements. The solution also provided long-term reliability while minimising disruption to the laboratory.

x

Contact With Us!

Bioline Global Pty Ltd PO Box 873
Narellan, NSW 2567

Monday – Friday, 8am – 5pm
Cart (0 items)