Chemistry Building Water Systems

Case Details

Client Name: Australian National University, Tim Borough

Client Website: www.anu.edu.au

Client Location: Canberra, ACT

Project Duration:

Need more help?

Reach out by phone or email or send a sample — our technical experts are ready to help!

Address Business
Bioline Global Pty Ltd

PO Box 873, Narellan NSW 2567
Working Time
Monday - Saturday: 8:00am - 6:00pm
Holiday : Closed
The Problem

Essential System Upgrade without Disrupting Research

The Chemistry Building at ANU required replacement of its ageing water purification systems. The replacement needed to occur without interrupting supply to active research and teaching laboratories.

The system had to be installed in the existing space while maintaining continuous service to researchers. Downtime was not an option, as this would have impacted sensitive experiments and student coursework. The system needed to be replaced inline, so there was only minimal disruption in the switching over of the systems.

Our Solution

Staged Installation with High-Efficiency Water Systems

Four high-capacity 120L/hr RO EDI Neptec systems were installed, supported by UV lamps and circulation pumps. The use of generic components ensured ease of maintenance and reduced long-term servicing costs. Installation was staged to keep laboratories continuously supplied with purified water.

Project Results

Reliable, Cost-Effective Water Supply for Research Continuity

The Chemistry Building received a modern, high-efficiency system with excellent water conversion factors. The upgrade improved reliability, reduced costs, and ensured uninterrupted laboratory operations throughout the transition.

x

Contact With Us!

Bioline Global Pty Ltd PO Box 873
Narellan, NSW 2567

Monday – Friday, 8am – 5pm
Cart (0 items)